Construction of the North Side Sewage Treatment Works began in 1923. The first work was laying a 24-inch drain for the site north of Howard Street and west of the North Shore Channel. A steam shovel excavating the drain trench is loading spoil into dump cars, September 27, 1923. The drain discharged to the channel. (MWRD photo 10114)