Building the Canal to Save Chicago

Chapter 7 Photos

Earth Section

Show More

© 2020 by Everything Goes Media, LLC

Conspire Creative

Everything Goes Media

Lake Claremont Press

Lake Claremont Press: A Chicago Joint

S. Woodhouse Books

BC-Photo 7.8

The excavation of the Main Channel in Section L, 1895. The total depth of the excavation is accomplished in two lifts. The upper lift spoil is transported to the left and the lower lift spoil is transported to the right. (MWRD photo, Geiger set, image 212)