Building the Canal to Save Chicago

Chapter 6 Photos

Earth and Rock Section

Show More

© 2020 by Everything Goes Media, LLC

Conspire Creative

Everything Goes Media

Lake Claremont Press

Lake Claremont Press: A Chicago Joint

S. Woodhouse Books

BC-Photo 6.11

October 6, 1898. The final grading and slope paving or armoring for the Main Channel in Section F. This protection was necessary to resist the erosive force of the water that would eventually flow in the Main Channel and to maintain the stability of the sloping channel bank. (MWRD photo, disc 5, image 90)