Building the Canal to Save Chicago

Chapter 6 Photos

Earth and Rock Section

Show More

© 2020 by Everything Goes Media, LLC

Conspire Creative

Everything Goes Media

Lake Claremont Press

Lake Claremont Press: A Chicago Joint

S. Woodhouse Books

BC-Photo 6.3

Mule-drawn scrapers remove unconsolidated dry soils in Section D, July 10, 1894. The excavated material was loaded into mule-drawn carts for transport to the spoil area or to the levee constructed to separate the Des Plaines River and the Main Channel. (MWRD photo, disc 26, image 30)